Tag Archive | "bridge"

Tags: , , , , , , , , ,

BUSINESS BEAT: Revitalizing Pompano Beach

Posted on 09 August 2018 by LeslieM

By Karen Lustgarten

Horacio Danovich sits in a conference room at the Pompano Beach City Hall surrounded by maps, master plans and diagrams pinned to the walls. The illustrations reveal the farsighted future of Pompano Beach. As manager of the city’s capital improvement programs, he holds the revitalization development vision of the city/CRA partnership putting Pompano Beach on the desirable destination map with innovations from “Smart City” concepts. In fact, revitalization of the 260-acre downtown area will feature one 70-acre section called the Innovation District. Here, most of the city/CRA-owned land parcels are ripe and poised for development right now.

Think designed navigable waterway systems and drainage between I-95 and Dixie Highway and MLK Jr. and W. Atlantic Boulevards. Inspired by Amsterdam’s canals, residents and visitors will be able to kayak, canoe and paddleboard along the waterways. These will be bordered by landscaped biking lanes and pedestrian walkways inspired by San Antonio’s The Riverwalk.

Picture a surrounding hub of mixed-use commercial office/retail buildings, restaurants, residential dwellings and cultural attractions. The goal of this urban design vision is to develop an enjoyable, livable urban area that’s functional and attractive to businesses and residents, and promote connections between people and places with surrounding communities.

This is a unique type of urban design that does not exist in the State of Florida today,” said Danovich. “As a result, agencies like the Army Corps of Engineers and the Florida Department of Environmental Protection will have a difficult time evaluating and permitting it for its intended mixed-use.”

He estimates two years for the design and permitting process before construction can begin in the Innovation District, then another two years to build it for a grand total of approximately $750 million (for the entire Innovation District.)

Thus we caught Danovich up to his elbows in federal grant applications to the U.S. Economic Development Administration: $2.5 million toward the first $5 million for the designs of the waterway systems, roadways, bridges, sidewalks, landscaping, lighting, underground utilities and permitting.

If he builds it, will they come? Indeed, the Innovation District Project could generate an estimated 4,000 jobs, he estimates.

The city is moving very fast in the right direction, ripe for redevelopment,” says Mr. Danovich.

Among the construction companies revitalizing the pier and the Atlantic Boulevard bridge are Burkhardt, West, Murray Logan and Whiting-Turner. Brandon Rhodes, Burkhardt Construction’s project manager, described the scope of work for the bridge and some challenges with the project. The bridge renovation will feature cantilever walkways underneath, a renovated tender house, decorative fish murals, decorative Wyoming rails, new lighting fixtures and the stunning showpiece — four 50-ft. high tensile sails at each corner of the bridge.

An initial challenge is creating the tensile structure sails on large posts and the construction of a foundation for each post,” he said.

The construction requires potholing existing utilities — hand digging along with machinery down to existing utilities in-ground, then evaluating if the existing utilities are in conflict with location changes needed.

West Construction has begun a yearlong project demolishing and rebuilding the outdated Fire Station 24 that borders Pompano Beach Airpark on NE 10th street. The new two-story fire station will service both the airport and surrounding community with updated equipment and alert systems.

This project has its site challenges, such as working in a fairly tight space with FAA regulations imposing height restrictions for cranes. Nonetheless, notes Michael Lilly, project manager, “It is in a key location that will help toward the revitalization of Pompano Beach. The community really needs it.”

Pompano Beach is positioned like Ft. Lauderdale and Delray Beach were 20 to 30 years ago,” says Danovich, “except we learned from their mistakes.”

For more information about the Pompano Beach revitalization projects visit www.pompanobeachfl.gov/pages/files.

Karen Lustgarten is President of Multi-Media Works, a multiple award-winning media company specializing in video, PR, print and social media with offices in Broward and Palm Beach Counties. She won awards for writing/producing videos and for website content. Karen founded a newspaper in Washington, DC and was a syndicated columnist and best-selling author. www.multi-mediaworks.com.

Comments Off on BUSINESS BEAT: Revitalizing Pompano Beach

Tags: , , , , ,

LETTERS TO THE EDITOR

Posted on 26 May 2016 by LeslieM

Open Letter to City of Lighthouse Point

Dear Mayor and Commissioners:

The bridge on 36 Street is very old and in poor condition. Among all the many bridges in Lighthouse Point, this bridge is, without question, the most critical bridge in the city. This bridge provides the single and only access to: (a) over 1,000 residents in 400 single family homes, (b) to St. Paul the Apostle Catholic Church, (c) to Frank McDonough Park, (d) the dock for the City Police Boat at Fletcher Park, and (e) for business access to Cap’s Place. If this bridge is damaged, there are not any alternate routes for detours and no other access whatsoever for all these residents.

At the present time, there are substantial bumps in both lanes on this bridge going each way. The earth supporting the approaches has been sinking over time and these approaches are in need of repairs again. Even the concrete retaining walls supporting these approaches are cracked as recent pictures have shown.

Cary Winningham, PE, our City Engineer, has made recommendations for repairs and I believe our Public Works Dept. is planning repairs this summer, hopefully, well before the coming peak hurricane season.

In addition, there is that mammoth tree on the northeast bridge approach. Our mayor has spoken with the County Arborist who thinks this tree “should” survive a hurricane; however, [neither] this arborist nor our engineer will guarantee its survival.

Mentioning hurricane season brings up what I believe is a major hazard to that most strategic bridge for over a thousand of our residents. This year, on TV, we have seen the crazy weather all over our country, and South Florida has been lucky for many years. A major hurricane hitting the Pompano area would create extremely high hurricane winds from the north and northeast, the most likely directions to blow that tree down onto our bridge. If that bridge is damaged or blocked, all the Lake Placid residents have no access for emergency medical or police assistance, and their homes and the church have no fire protection whatsoever.

In addition, if you drive by, you will notice that this mammoth tree also surrounds and endangers the only electric power to our 1,000 Lake Placid residents, as well the resident, in the Town of Hillsboro Beach. While blocking this roadway, one lane at a time, to fix the bumps on the approaches, it would be the appropriate time to entirely remove that tree or drastically cut back all those big limbs to protect Lake Placid residents’ access and electric power to their homes, and to protect our old bridge until its complete rebuilding takes place.

Leo L. Bentz

Lighthouse Point

[This issue was presented at a recent LHP commission mtg. See more on pg. 4.]

Comments Off on LETTERS TO THE EDITOR

Tags: , , , ,

Broward-Palm Beach Flyover Bridge on Dixie Opens Apr 10

Posted on 09 April 2012 by JLusk

DOT Officials plan to hold a ribbon-cutting ceremony on the span at 9:30 a.m. Tuesday Apr 10. By 11 a.m. Cars should be cruising across the bridge. it is going to be a little tricky with the speed limits. Here is the deal: When you are heading  into Broward southbound the speed is 40, then somewhere on the bridge just before you hit the lights at Hillsboro it changes to 35. Northound into Palm Beach it will be 40 all the way.  Pay attention.

The $39.5 million, four-lane bridge carries Dixie over the Florida East Coast Railway, several Deerfield Beach streets and the Hillsboro Canal.

Broward and Palm Beach counties received federal economic stimulus money to pay for the construction.

Officials say they pushed for the span to eliminate a bottleneck where Dixie narrowed to two lanes through Deerfield Beach and crossed the tracks. They say it will ease travel between the two counties and serve as a hurricane evacuation route.

A smaller bridge was built to carry Northeast Second Avenue over the canal. That bridge, which has been carrying two-way traffic, will become one-way southbound after the flyover opens and serve as a ramp for southbound Dixie drivers coming from Boca who want to go to downtown Deerfield Beach or Pioneer Park.

Although the flyover is finished, the entire project won’t be completed until June.

Workers still have to install street lights, signs and landscaping, paint the bridge and put down permanent lane striping and a final layer of asphalt.

After the flyover opens, the intersection of Northeast Second Avenue and Second Street will close for about four weeks while it is rebuilt with brick pavers.

Observer TV will be the first video at full speed crossing the bridge.

Comments Off on Broward-Palm Beach Flyover Bridge on Dixie Opens Apr 10

Tags: , ,

Bridge Closed for Renovations on Hillsboro Blvd.

Posted on 10 November 2011 by LeslieM

During fall 2011, the Florida Department of Transportation (FDOT) will perform bridge renovations underneath and inside the Hillsboro Boulevard Bridge.

This work requires the bridge to be closed at nighttime, Sunday through Thursday, for a three week span, beginning Dec. 4. and ending Dec. 23 (Please note, the bridge will not be closed Friday or Saturday nights).

During bridge renovations, all traffic crossing the Hillsboro Boulevard Bridge will be detoured to the Palmetto Park Road Bridge via U.S.1 or A.1.A.

Bridge renovations include:

High pressure water cleaning

Sand blasting

Painting steel beams underneath bridge

Work will occur from 7 p.m. to 6 a.m.

Bridge renovations are never easy for residents and business owners living in or around the construction zone. The project team appreciates your patience and understanding during this difficult time.

Project Office Location:
275 Commercial Blvd. Suite 260
Lauderdale by the Sea, FL 33308
954.218.2955
miglesias@corradino.com

Comments Off on Bridge Closed for Renovations on Hillsboro Blvd.

Tags: , , , , , , ,

14 St. Causeway closed July 14-15 to film TV show “The Glades”

Posted on 06 July 2011 by LeslieM

Photo courtesy of A&E TV - a scene from the TV show the Glades

The NE 14th St. Causeway Bridge in Pompano Beach will be closed by the Florida Department of Transportation to all vehicles, pedestrians and bicycles from 7:00 p.m. Friday, July 14th, to 7:00 a.m. Saturday, July 15th for filming of The Glades television show.

Also, the bridge will not open for boats from 9:00 a.m. Friday, until 5:00 a.m. Saturday. 

Please seek alternate routes at the Atlantic Boulevard Bridge to the south or Hillsboro Boulevard Bridge to the north.

Originally, “The Glades” was slated to film July 7th and 8th, but had a last minute change due to the weather.

Comments Off on 14 St. Causeway closed July 14-15 to film TV show “The Glades”

Advertise Here
Advertise Here